app.coraaos.com / living-plant-framework · Facility A · Week 23
Live · synced 4 min ago
Safety
Quality
Productivity
KPI Alert — Automated CAPA Request Sent
SOP Completion dropped to 87% on Shift B — below the 90% threshold.
A CAPA request has been automatically emailed to M. Torres (Supervisor) and D. Owens.
Safety Intelligence — Facility A
Shift B · Supervisor: M. Torres · Week 23 of 2026
Last sync 4 min ago
TRCR YTD
0.07%
↓ vs prior year
Open Near-Misses
3
2 overdue for review
Open CARs
7
2 past due date
SOP Completion
94%
Last audit: 0 non-conformances
Open Corrective Actions
2 Past Due
Lockout/Tagout — Press Line 4
Near-miss Jun 3 · Root cause: procedure gap
R. Kim
Jun 6 ⚠ Past Due
PPE Compliance — Finishing Dept.
Observation Jun 1 · Retraining scheduled
D. Owens
Jun 9 · In Progress
Forklift Path Markings — Bay 2
Observation May 29 · Paint ordered
T. Walsh
Jun 14 · Planned
Chemical Storage Labels — Lab
Resolved May 22 · Labels installed
S. Park
✓ Closed
Near-Miss Trend · 8 Weeks
W16
W17
W18
W19
W20
W21
W22
W23
Quality Intelligence — Facility A
Line 2 · Inspector: J. Reyes · Week 23 of 2026
Last sync 2 min ago
First Pass Yield
97.3%
↑ 0.8% vs last week
Open NCRs
4
1 in containment
Customer Complaints
0
3rd consecutive week
Inspection Pass Rate
99%
↑ from 96% last audit
Defect Cluster Log — W23
1 Containment Active
Surface Scratch — Part #A204
12
↓ 40%
Contained
Weld Porosity — Bay 3
5
↑ 2
Open
Dimension OOT — Shaft Housing
3
↓ 60%
Review
Label Misprint — Packaging
1
—
Closed
Controlled SOPs — Approval Status
Weld Inspection Procedure v3.1100%
Final Assembly Checklist v2.494%
Packaging & Label SOP v1.888%
Receiving Inspection v2.0100%
✓ Approved versions auto-distributed · Floor always runs current revision
Productivity Intelligence — Facility A
All Lines · Plant Manager: C. Reed · Week 23 of 2026
Last sync 1 min ago
OEE — Overall
81%
Target: 85%
Units Produced
4,821
↑ 3.2% vs last week
Downtime Events
6
2 unplanned · 47 min lost
On-Time Delivery
98%
↑ 2pts vs prior week
OEE Breakdown — Line Performance
Line 1
88%
Line 2
81%
Line 3
74%
Assembly Bay
91%
Line 3 below target — KPI alert sent · CAPA requested